en

请输入关键词搜索相关内容

关闭搜索框
关闭搜索框
2015-09-11

on 10th of october, 2011, cmc international tendering co. published bidding evaluation result that guolin won the bidding first contract project of 3*35kg/h ozone generator. 
beijing gaobeidian waste water treatment factory use membrane ozone treatment process to increase reclaimed water capacity of 1million m3/day. the discharged water is used for river and lake sight,industrial water and green lands irrigation.
gaobei dian reclaimed water factory and reclaimed water reuse project is the sixth reclaimed water factory which got approval in beijing drainage group upcycle projects, which is also the reclaimed water project with big scale.
name of bidders are: ozonia, mitsubishi, guolin etc. after strict evalution, guolin won the bidding and this is also the third time for guolin to cooperate with beijing drainage group.  

customer service

客户
服务

400-653-2616

  • 客服中心

    400-653-2616

  • 7×24全年无休服务

    2小时快速响应,

    24到达现场

  • 智能主动服务

    完善的客户服务档案,

    为您提供积极主动服务

  • 专家贴心服务

    我们与国内的臭氧运行及

    应用技术专家长效合作

  • 升级改造服务

    协同您对臭氧发生系统中

    相关设备进行升级改造

回到顶部
网站地图